by Support Shape | 23 July 2020 | Fire Resistant EN, Projects, Window Systems EN
Extention of Metro Line 3, “Haidari – Piraeus” Ilicon had been awarded the supply and installation of fire resistant stainless steel glazed partitions at the staircases that lead to the platform, in stations “Koridallos” and “Nikaia” of the Metro Line 3 extension. In...
by Support Shape | 23 July 2020 | Fire Resistant EN, Projects
Ethniki Pangaia, 02.2020 In February 2020, the renovation works for the Ethniki Pangaia office building were completed, right in the center of Athens. In this project, ilicon had been awarded the supply and installation of aluminum fire resistant glazed partitions and...
by Support Shape | 12 December 2019 | Fire Resistant EN
The Orbit, 12.2019 “The Orbit” is a new state-of-the-art office building by Noval Properties, with total surface of 42,000 sqm, with 9 floors and 6 basements, located on Kifissias Avenue. ilicon has been awarded the supply and installation of fire resistant aluminum...
by Support Shape | 25 June 2019 | Projects, Shading systems EN
In the project Luxurious Residential apartments, the Pellini electric blind system inside the double glazing was selected for dynamic shading, better aesthetics, protection against dust, duration over time. ilicon supplied the system. Specifications: Location: MARINA...
by Support Shape | 5 June 2019 | Projects, Shading systems EN
In a private residence, the owner selected to install a Pellini electric blind system inside the double glazing for dynamic shading, better aesthetics, protection against dust, duration over time. ilicon supplied the system chosen by the customer. Specifications:...
by Support Shape | 5 June 2019 | Fire Resistant EN, Projects, Window Systems EN
The construction of the “Onassis Stegi” by the Alexander S. Onassis Public Benefit Foundation was completed in 2011. ilicon had been awarded the supply οf fire resistant steel glazed partitions. Specifications: Location Athens, Attica Client Onassis Cultural Centre,...
Recent Comments