National Gallery, 2020
In 2020, ilicon undertook the structural analysis, design, construction and installation of the central point-fixed glass façade supported by a tension structure in the building of the National Gallery, which was expanded and renovated by the Ministry of Culture and Sports and the operation began in March 2021.