National Gallery, 2020

In 2020, ilicon undertook the structural analysis, design, construction and installation of the central point-fixed glass façade supported by a tension structure in the building of the National Gallery, which was expanded and renovated by the Ministry of Culture and Sports and the operation began in March 2021.

Specifications:

Location: Athens
Client: TOMI construction for the Ministry of Culture and Sports
Description: Tubular steel trusses, post-tensioned steel rod-rigging, point-fixed laminated glazing
Square meters: 1540